Classweekly

Science Fair Project Planner

Written by Adi Ackerman, Head Teacher

"Science Fair Project Planner" is written for 5th Grade (Ages 10-11). If your little one is a year younger but already steady on scientific method, the page still works. You may just need to read the instructions out loud. And if they are older and experiments and data never quite stuck, this is a short review rather than busywork.

Popular with 5th Grade teachers · Downloaded 358 times
Science Fair Project Planner - Page 1
Science Fair Project Planner - Page 2

2 pages in this set


Science fair project planner for 5th grade. Kids follow a 6-week checklist and plan a question, hypothesis, variables, steps and display board. Part of our experiments and data scientific method collection. Aligned to NGSS standards.

How do I use this worksheet?

Set out the materials listed on each sheet and run three trials as the steps say, so students see why repeated trials matter. Do the experiments with a grown-up nearby. Have students fill the data table before they graph, then write the conclusion from the numbers, not from their guess. The science fair planner works as a six-week checklist students can keep in a folder.

What students will practice

  • Students will run experiments with three trials, record data in a table and find totals.
  • Students will draw bar and line graphs and use data to answer questions.
  • Students will write a conclusion with a claim and evidence, and plan a science fair project.


Curriculum Links

Find this in the curriculum

Browse the grade, subject, and topic this belongs to.

FAQ

How do I use this experiments and data worksheet?

⌄

Set out the materials listed on each sheet and run three trials as the steps say, so students see why repeated trials matter. Do the experiments with a grown-up nearby. Have students fill the data table before they graph, then write the conclusion from the numbers, not from their guess. The science fair planner works as a six-week checklist students can keep in a folder.

What does this worksheet teach?

⌄

Seven experiment and data worksheets for 3rd to 5th grade. 3rd grade students test the absorbency of three paper towel brands and graph the results, and use a two-page experiment record sheet for their own test. 4th grade students plan a fair test with paper airplanes, flying three wing designs three times each, and plot plant growth data on a line graph. 5th grade students read pendulum data and write a claim with evidence, time how fast sugar dissolves in three cups of water, and plan a science fair project over six weeks. The line graph and pendulum data sheets have answer keys.

Can I use this experiments and data worksheet for homeschool or classroom?

⌄

Yes, both. We made it for 5th Grade scientific method, and the page works the same whether it lands on a kitchen table or a center rotation. At home, most families go through it together and talk the answers out loud, and that talking is where most of the learning happens with experiments and data. In class it runs well as independent work while you pull a small group. Print one copy or thirty, whichever the day needs.

Why do experiments use three trials?

⌄

Doing a test three times shows whether a result was a fluke. Students add or average the trials, so one odd result does not change the conclusion.

What goes in a science fair project?

⌄

A testable question, research, a hypothesis, materials, steps, data from several trials, a graph and a conclusion. The 5th grade planner spreads these over a six-week checklist and maps them onto a display board.

What grades are these scientific method worksheets for?

⌄

3rd, 4th and 5th grade: five sheets for 3rd grade, four for 4th grade and four for 5th grade. Sheets for Kindergarten to 2nd grade are on the 1st grade scientific method page.

What are the 6 steps of the scientific method?

⌄

Ask a question, do research, form a hypothesis, test with an experiment, analyze the data, and draw a conclusion and share the results. The 3rd grade steps sheet has students put them in order and match each one to part of a ball-bounce experiment.

How do kids write a hypothesis?

⌄

Use the frame If, then, because: if I change this, then this will happen, because of this reason. The if part is what you change, and the then part is what you measure. The hypothesis sheet walks through one example, then gives four testable questions to try.

What is a fair test?

⌄

A fair test changes only one thing and keeps everything else the same, so you know that one change caused the result. The thing you change is the independent variable, what you measure is the dependent variable, and what you keep the same are the controlled variables.

Do these worksheets have answer keys?

⌄

Eight of the thirteen do, the ones with a right answer, such as ordering the steps, observation or inference, and identifying variables. The experiment sheets and the science fair planner use each student's own data, so they have no key.

Ratings & Reviews

No reviews yet. Be the first to share what you think.

Reviews are for ClassWeekly members.

Make a Request

Spotted something to fix, or want a worksheet we don't have yet? Tell us and we'll make it.

Worksheet Details

Grade5th Grade
SubjectScience
TopicScientific Method
Pages2 pages
DifficultyMedium

What is ClassWeekly?

ClassWeekly offers free worksheets and printable learning resources for kids in preschool to grade 5. All worksheets are aligned to Common Core, NGSS, and C3 Framework standards and designed by educators. Become a member to access the full library and download unlimited PDFs.